Construction for Downtown Bellevue Light Rail Tunnel has Reached Completion

by Kara | September 3, 2020 | Downtown Bellevue Network

Construction has reached completion on the Downtown Bellevue tunnel. The tunnel is a part of the East Link light rail extension planned to open in 2023.

According to Sound Transit, the new lines includes 10 stations connecting Seattle, Mercer Island, Bellevue, and the Overlake area near the Microsoft campus. The length of East Link is over 14 miles long.

Trips from Downtown Bellevue to the International District/Chinatown Station in Seattle will take 20 minutes in total.

The Bellevue Downtown Station is street level at Northeast 6th Street. It includes entrances on the east side of 110th Avenue Northeast and the west side of 112th Avenue Northeast. It will provide access to Meydenbauer Center, Bellevue City Hall, and the existing transit center.

LINK TO ARTICLE  |  BACK

Press Disclaimer

Links to third-party websites and information on this site are provided solely as a convenience to you. We, Bosa Development Projects LLC., are not responsible for the content of any of the suggested sites and your decision to view or use any of these sites or the material on them is at your own risk. We have not reviewed all of these third-party sites and do not control and are not responsible for any of these sites or their content. We do not endorse or make any representations about them, or any information, software, or other products found there, or the results that may be obtained from using them. If you decide to access any of the third-party sites linked to this site, you do this entirely at your own risk. We disclaim all warranties, express and implied, as to the accuracy, validity, legality or otherwise of any materials or information contained on any site to which we may have provided any link.